CURRENT PROJECTS: Project 4

SEWAGE LOSS RECOVERY

Started: December 3, 1999

Completed:

 

The grease trap drain in the kitchen was blocked down 10-15 feet down the line.   

Effluence was visible throughout the entire downstairs area.Three man crew arived and started with setting contanment, creating critical barriers at each stairwell, and pass throughs were setup at the front and back entrances of the building. Negative air flow was then established.The contents to be kept were sorted, separated, boxed, labeled " CLEAN" and placed in an uncontaminated area for relocation. Loose debris was removed from the floors using HEPA vacuum. 

two 40 cubic yard roll-offs were deliverede and damaged contents were discarded. Continued sweeping and HEPA cacuuming of loose solids from the floors in various rooms. .

    

 

The 2nd containment step was initiated by cleaning of the source bathroom was also performed.



 

 
 
 
 
 
 
 
 
 