CURRENT PROJECTS: Project 2

A Sewage backup that turned into a mold remediation project.

Started: June 10, 2001

Completed: September 2001

Location: Sherman Oaks, California

Mold smells were noticed coming from within the master bathroom when the door was left closed over night. After further investigation mold was found growing on the back side of the shower wall.

A hot water valve to the shower had a slow leak on the inside of the wall. We were able to pull the access panel off from the outside wall and found the mold.

 



 

 
 
 
 
 
 
 
 
 